Do We Need a Reliability Engineer? Ten Questions Plant Managers Ask, Answered

These are the questions we hear from plant managers and maintenance managers before they bring in reliability help. The answers are short on purpose. If one of them raises a second question, ask us.

Do we need a full-time reliability engineer?

Most plants under a few hundred assets do not need one on payroll. They need the reliability engineer function: someone who ranks the equipment, finds the repeat failures, fixes the PM program and keeps the records honest. A full-time hire runs well into six figures with benefits and takes six months to find. A monthly program gives you a block of hours each month that goes where the need is, for a fraction of the cost, and the records stay with the plant if you stop.

How do we find bad actors when our CMMS data is thin?

Start with what exists. Work orders, even badly coded ones, show which equipment keeps appearing. Parts purchases show what keeps getting replaced. The crew knows what they are called to at night. Put those three together for one process area and the bad actor list is usually obvious. Build the register as you go so the next analysis is easier. Thin data is a reason to start, not a reason to wait.

What does a criticality assessment cost?

It depends on the number of equipment items, not the size of the plant. A single process unit of a few hundred items is a few weeks of work and fits inside a month or two of our program hours. A whole plant is scoped by unit count and quoted before we start. The on-site assessment that tells you where to begin is a fixed $5,600, travel included.

Our PMs come straight from the vendor manuals. Is that a problem?

Usually, yes. Vendor manuals are written to protect the warranty, not to match your duty, your environment or your failure history. The result is too many tasks on equipment that does not fail and too few on the equipment that does. A PM optimization compares each task to the failure modes it is supposed to prevent and removes, changes or adds tasks accordingly. Most programs lose a quarter of their tasks and gain a handful of important ones.

We are a food plant, not a refinery. Does any of this apply?

All of it. Criticality, failure modes, PM strategy and spares logic are the same on a filler as on a pump. What changes is the consequence side: food safety, sanitation time, missed orders. We score for those. The large consultancies skip food and beverage, which is exactly why the gap is large and the gains are fast.

How long before we see results?

A bad actor analysis pays back in the first quarter, because the top three repeat failures are usually cheap to fix once they are named. A PM optimization shows up in labor hours within two or three months. A criticality ranking does not save money by itself; it tells every other decision where to spend first, and that compounds.

Do you have to be on site?

The first assessment is on site. There is no substitute for walking the plant and talking to the crew. After that, most program work is done remotely from your CMMS data and your records, with site visits when the work needs eyes on the equipment or a turnaround is in the field.

We are about to change CMMS. Should we clean the data first or after?

Before. A CMMS migration carries whatever you load into it, and the integrator’s job ends at go-live, not at clean data. Build the asset register, fix the hierarchy and strip the dead PMs before the move. The new system then starts with records the planner can trust, and the migration itself goes faster.

Can you help with our turnaround or shutdown?

Yes. We run turnaround readiness across six phases and five gates, from scope freeze through startup. We can manage the event, fill a planning or readiness role, or review your plan and tell you where it is thin. The readiness review is the cheapest insurance a turnaround can buy.

Where do we start?

With one process unit. Rank it, find its repeat failures, fix its PMs and its spares, and load the results into the CMMS. That takes a few months, proves the method to the crew, and gives you the numbers to decide whether to do the rest. If you want the starting point chosen for you, the on-site assessment does that in one visit.

Two ways to start

The Site Reliability and Operations Assessment is $5,600, fixed price, travel included: a plant walk, a CMMS and failure history review, crew interviews and a scored report on what to fix first. The Reliability Support Plan is one flat monthly rate for a block of hours that goes where the need is, month to month or on a 3, 6 or 12 month term. If you would rather score your own program first, the free self-assessment takes about three minutes.